Description |
1 online resource (1,410 pages) : illustrations (some color) |
Physical Medium |
polychrome |
Description |
text file |
Bibliography |
Includes bibliographical references at the end of each chapters and index. |
Contents |
Cover; Title Page; Copyright; Contents; Preface; Executive Committee; Session Chairs; International Committee; Part 1: Caverns and Large Spans; Holmestrand Underground Railway Station from Vision to Reality; New York City Grand Central Subway Station Planned Modifications and Improvements; Second Avenue Subway Project: Design and Construction of Large Cavern Final Linings and Penetrations at 86th Street Station; Roof Displacements in Pump Station Cavern in the Chagrin Shale; St. Louis' Sewer Tunnel Vision; Part 2: Contracting Practices. |
|
I-70 Twin Tunnels Widening Using Drill and Blast Under CM/GC ContractSupport of Excavation for Roosevelt Station: Successful Partnering Overcomes Challenging Construction Change; Seattle Light Rail Tunnels Quality Control and Assurance: Stakeholder Collaboration Delivers Successful Project; Integrated Design Process for First Street Tunnel; Partnering Through Risk Management: Lake Mead Intake No. 3 Risk Management Approach; Construction-You Need Risk-Based Cost Estimating; Part 3: Design and Planning I. |
|
Critical Connections: Planning and Preparation Needed for the Eastside Access Project's Westbound Bypass Jacked Shield TunnelSouth Hartford CSO Tunnel and Pump Station; High Speed Two (HS2)-General Overview of Project with Focus on Tunnelling Challenges; Evolution of Large-Diameter TBM Road Tunnel Design; Project Configuration and Design Challenges for the City of Ottawa Combined Sewage Storage Tunnel Project; Modelling of Ground Deformation Control Induced by Slurry Shield Tunnelling; Part 4: Design and Planning II. |
|
Continuing a Legacy of Large-Diameter Hard Rock Tunneling in Chicago-The Des Plaines Inflow TunnelElements of the Istanbul Strait Highway Tunnel; Design and Construction Considerations for the Blacklick Creek Sanitary Interceptor Sewer Project in Franklin County, Ohio; Deep Tunnel Pump Station-Design/Construction; Decision Process and Criteria for Selection of a Preferred Tunnelling Method; Part 5: Design-Build Projects; Urban Challenges of the Downtown Los Angeles Regional Connector Tunnel Project; Concrete Operations at the 86th Street Station for the 2nd Avenue Subway Line. |
|
PPP Mode for Procurement of Lines 2 and 4 of Lima MetroUnique Characteristics of the Design and Construction of the Second Midtown Tunnel in Hampton Roads, Virginia; Practical Aspects of Final Design Development Using Design-Build Procurement; The Planning and Procurement Process of the Northeast Boundary Tunnel (NEBT) Project: DC Water-District of Columbia; Part 6: Difficult Ground; Challenges and Methods Utilized to Excavate Rock for an Escalator Incline Through a Luxury High-Rise Building in Manhattan. |
Local Note |
eBooks on EBSCOhost EBSCO eBook Subscription Academic Collection - North America |
Subject |
Excavation -- Congresses.
|
|
Excavation. |
|
Tunneling -- Congresses.
|
|
Tunneling. |
|
Underground construction -- Congresses.
|
|
Underground construction. |
Genre/Form |
Electronic books.
|
|
Conference papers and proceedings.
|
|
Conference papers and proceedings.
|
Added Author |
Johnson, Mark (Mark C.), editor.
|
|
Oginski, Shemek, editor.
|
Other Form: |
Print version: Rapid Excavation and Tunneling Conference (2015). Rapid Excavation and Tunneling Conference 2015 proceedings. Englewood, Colorado : Society for Mining Metallurgy & Exploration, ©2015 xv, 1387 pages 9780873354141 |
ISBN |
9780873354165 (electronic book) |
|
0873354168 (electronic book) |
|
9781680156898 (electronic book) |
|
1680156896 (electronic book) |
|
9780873354141 |
|